Daily News: Policy № 26e, 26.01.2024
Content
At night, russians strike Kherson with 2 S-300 missiles
Occupiers shell Kherson Region 73 times, 1 person killed
Ukraine will start construction of 4 new nuclear reactors in 2024
Law Enforcement Agencies
At night, russians strike Kherson with 2 S-300 missiles
(Ukrainian News, Mazur Oleksandr, 26.01.2024 10:08:00)
Overnight into January 26, the russian occupation forces fired two S-300 missiles at the city of Kherson, damaging a kindergarten, a high-rise building, and a shopping center. The attack wounded a woman as a result of the attack.
This follows from a statement by Oleksandr Prokudin, the head of the Kherson Regional Military Administration.
"This night, the russians shelled Kherson with S-300 air defense systems. The city was hit by two rockets. A kindergarten, a high-rise building, and a shopping center building were damaged by enemy fire," the report says.
It is noted that a 54-year-old Kherson woman received a leg injury and an explosive injury in her own home. She was treated on the spot.
As the Ukrainian News agency earlier reported, meanwhile, the Armed Forces of Ukraine (AFU) are warning about the danger in the border areas of the Sumy Region due to both artillery and air strikes by the russian occupiers, as well as the activity of subversive groups of the russian federation.
Occupiers shell Kherson Region 73 times, 1 person killed
(Ukrainian News, Mazur Oleksandr, 26.01.2024 10:34:00)
During the past day, on January 25, the military aggressor states of the russian federation fired 73 times at the peaceful settlements of the Kherson Region, firing 350 shells, using mortars, artillery, MLRSes, tanks, and unmanned aerial vehicles. The enemy launched a missile attack on Kherson, using ballistics. It also directed 26 shells at the city.
Oleksandr Prokudin, the head of the Kherson Regional Military Administration, announced this on his Telegram channel.
Thus, the russian military targeted the residential quarters of the population centers of the region, a preschool educational institution, and a shopping center in Kherson, a cell tower in the Beryslav District.
As a result of russian aggression, one person was killed, and one was wounded.
As the Ukrainian News agency earlier reported, overnight into January 26, russian occupation forces fired two S-300 missiles at the city of Kherson, damaging a kindergarten, a high-rise building, and a shopping center. The woman was also injured as a result of the attack.
Earlier, it was reported that the fighters of the Special Operations Forces destroyed a russian enemy infantry fighting vehicle (IFV) that was shelling the right bank of the Kherson Region.
Economics
Ukraine will start construction of 4 new nuclear reactors in 2024
(Ukrainian News, Usachov Olexandr, 26.01.2024 10:49:00)
Ukraine will begin construction of four new nuclear reactors in the summer or fall of 2024 as the country seeks to compensate for the loss of energy capacity due to the war with russia.
This follows from a statement by Energy Minister Herman Halushchenko in an interview with Reuters, the Ukrainian News agency reports.
Two of the units, which include reactors and related equipment, will be based on russian equipment that Ukraine wants to import from Bulgaria. At the same time, the other two will use Western technology from power equipment maker Westinghouse.
All four reactors will be built at the Khmelnytskyi nuclear power plant.
"With the 3rd and 4th units at the Khmelnytskyi NPP, we want to compensate for Zaporizhzhia, and we are currently negotiating with our Bulgarian partners about the two reactors that we want to take away. If we received the reactor bodies today, I believe that 2.5 years, and we would have a third reactor on the line," Halushchenko said.
In parallel with the construction of the Soviet-era VVER-1000 units, Ukraine wants to start preparatory construction work for the placement of two modern AP-1000 western units, also at the Khmelnytskyi NPP.
"We need to pass (parliamentary) legislation, and we have bills for the 3rd, 4th, 5th, and 6th power units. These are VVER-1000 and the 5th and 6th; we want to build them of the AP type. This is a parallel process," he said.
As the Ukrainian News agency earlier reported, in December 2023, the national nuclear power generating company Energoatom and the Westinghouse company (United States) signed an agreement on the purchase of equipment for Power Unit 5 of the Khmelnytskyi nuclear power plant (Khmelnytskyi NPP, Netishyn, Khmelnytskyi Region), which will be built using the American AR1000 technology.
Джерело: http://www.ukranews.com